The following information was last updated on September 30 2011
Facade installation is now abov..
The following information was last updated on September 30 2011
Facade installation is now above floor 59
Tower steel is now above floor 84
Concrete is now being installed above floor 76
Sprayon fireproofing underway
Elevator shaft fitout
Multiple cranes on site for steel and concrete installation
Both the south and north cores are now being erected as the structure rises
Cocoon safety system now in place around upper perimeter to rise with structure
Utility installation and tieins
Crews are coordinating substructure construction while maintaining PATH service
September (24th 30th) update images
» World Trade Center One
Steel up to the 84t..
September (24th 30th) update images
» World Trade Center One
Steel up to the 84th floor (1040 feet 317 meters)
Curtain glass on the 59th floor (709 feet 216 meters)
Concrete up to the 76th floor (928 feet 283 meters)
» World Trade Center Two Three
WTC 2 is continuing staying on the street level while WTC 3 is now installing the second floor of the basement
» World Trade Center Four
Steel up to the 50th floor (663 feet 202 meters)
Curtain glass on the 25th floor (302 feet 92 meters)
Concrete up to the 44th floor (597 feet 182 meters)
» World Trade Center Five
Groundbreaking
» Memorial Museum
Memorial is finished with all victim names on the pool corners with 225 trees planted on the site Museum is continuing to be constructed
» Transportation Hub
The second subfloor of the Transportation Hub is progressing
September (16th 23rd) update images
» World Trade Center One
Steel up to the 83r..
September (16th 23rd) update images
» World Trade Center One
Steel up to the 83rd floor (1027 feet 313 meters)
Curtain glass on the 57th floor (682 feet 208 meters)
Concrete up to the 75th floor (915 feet 279 meters)
» World Trade Center Two Three
WTC 2 reached the street level WTC 3 concrete reached the basement level out of the street level The first steel column of WTC 3 will be installed in the 4th week of September 2011 while the column of WTC 2 in January 2012
» World Trade Center Four
Steel up to the 49th floor (650 feet 198 meters)
Curtain glass on the 24th floor (289 feet 88 meters)
Concrete up to the 43rd floor (584 feet 178 meters)
» World Trade Center Five
Groundbreaking
» Memorial Museum
Memorial is finished with all victim names on the pool corners with 225 tress planted on the site Museum is continuing to be constructed
» Transportation Hub
The first subfloor of the Transportation Hub is completed
ONE WORLD TRADE CENTER SEEN FROM TRIBUTE PARK 740 AM THIS MORNING NOVEMBER 5 2011 ONE WORLD TRAD..
ONE WORLD TRADE CENTER SEEN FROM TRIBUTE PARK 740 AM THIS MORNING NOVEMBER 5 2011 ONE WORLD TRADE CENTER GOT MORE STEEL THIS PAST WEEK I BELEIVE THE WORKERS WILL BE WORKING THE 878889 FLOORS IF IAM CORRECT
httpfacebookcomilovenypl
Discovery RisingRebuilding Ground Zero 1 of 6 Reclaiming the Skyline
httpfacebookcomilovenypl
Discovery RisingRebuilding Ground Zero 1 of 6 Reclaiming the Skyline
1 WORLD TRADE SEEN FROM BEACH CHANNEL DRIVE AND BEACH 137TH STREET HERE 1 WORLD TRADE CENTER IS ..
1 WORLD TRADE SEEN FROM BEACH CHANNEL DRIVE AND BEACH 137TH STREET HERE 1 WORLD TRADE CENTER IS DOMINATING THIS ANGLE
The following information was last updated on December 1 2011
Facade installation is now above ..
The following information was last updated on December 1 2011
Facade installation is now above floor 62
Tower steel is now above floor 90 It is expected to top out in the first quarter of 2012
Concrete is now being installed above floor 85
Sprayon fireproofing underway
Elevator shaft fitout
Multiple cranes on site for steel and concrete installation
Both the south and north cores are now being erected as the structure rises
Cocoon safety system now in place around upper perimeter to rise with structure
Utility installation and tieins
Crews are coordinating substructure construction while maintaining PATH service
Special Thanks to
The Lower Manhattan Development Corporation